Analysis services

ONT PromethION24

Overview

This service is for sequencing analysis using PromethION24 (Oxford Nanopore Technologies). We currently offer both flow cell types R9.4.1 and R10.4.1. We prepare libraries using a ligation kit (e.g., SQK-LSK110, and 114)

Sample Submission Guidelines

DNA sequence analysis

2 µg or more of DNA
  • Submit at least 2 µg of DNA in a 1.5 ml DNA LoBind tube.
  • Please write down your name and the Redmine ticket number down on your sample tube.

Data Delivery

POD5/ fastq files
  • Output : 25-100 Gbase/single flow cell.
  • We do not guarantee the data amount.
  • Fastq files will be generated by the latest version of MinKnow’s default Basecaller (Guppy) with High-accuracy mode.
  • Please contact us if you need 5mC detection data.
  • Please contact us for a simple primary analysis (e.g., mapping).

Estimated delivery date

Please contact us.

Reference

1–2 weeks if kits are in stock, 3–4 weeks if not (FY2022 results).